Why shutdowns run over
Most overruns come from the same few places: scope added after the plan is set, work found once equipment is opened up, and parts or people that aren't ready on day one.
$349,000
per hour is what unplanned downtime costs the typical Australian industrial business.
24%
of Australian industrial businesses still run equipment until it fails, rather than maintaining it on a plan.
2 in 3
turnarounds globally exceed planned cost and schedule by 10% or more, or trip after start-up.
What each part of your team needs to check
A shutdown touches everyone. Each part of the team has a different question to answer before the window opens.
Engineering
Is it right for the application?
- Like for like, or an upgrade? Confirm before you order.
- Where it runs: zone, temperature, washdown, dust.
- Will it work with the control system already in place?
Maintenance
What will we find when we open it up?
- Use condition data to decide what gets replaced.
- Hold critical spares for discovery work.
- Plan the restart, not just the stop.
Integrators and OEMs
Will it fit the design?
- Part numbers and revisions match the drawings.
- Footprint, wiring and protocol are checked.
- Datasheets and certificates are ready before work starts.
Procurement and projects
Will it arrive on time?
- Lead times confirmed before dates are set.
- Longest lead items ordered first.
- Pricing and delivery locked in with a quote.
Your shutdown parts plan, step by step
-
Lock the scope early. Agree what's in the shutdown, then list every part the work needs.
-
Check the application, not just the part number. Confirm where each item runs and what it's doing, especially if it's an upgrade.
-
Check each item's availability. Every product page shows whether it's In Stock or Special Order.
-
Order Special Order items first, as they take the longest. Logged-in customers can use Request Quote from the cart to lock in pricing and timing.
-
Plan for discovery work. Hold critical spares for what you may find once equipment is opened up.
-
Confirm delivery timing with our team before you finalise your shutdown dates.
What else to plan into the shutdown
The parts list is one piece. These are worth building into the scope while the plant is down.
Set scope with condition data
Vibration and temperature trends show which assets need work, so the scope is based on evidence.
See condition monitoring ›Check conveyor protection
A shutdown is the time to check belt rip, slip and misalignment protection before the belts run again.
See conveyor downtime prevention ›Upgrade while it's down
A shutdown is often the only time new equipment can be tied into the existing plant. Plan upgrades into the scope early.
See industrial IT and networking ›Power for the works
Portable power distribution for crews working through the shutdown, including IECEx-certified options for hazardous areas.
See hazardous area equipment ›Check availability before you commit
Every product page shows its availability, so you can see what's ready before you commit to a date.
Held locally and shipped within 1 business day of your order.
Sourced from the manufacturer. Contact us to confirm timing before you plan around it.
What to expect on delivery
- In Stock orders ship within 1 business day.
- Delivery usually takes 1 to 7 business days, depending on your location.
- Click & Collect is available from our Perth and Sydney warehouses.
- If any items aren't ready when you order, we can part ship your order or hold it until everything is ready, depending on lead time.
- Free shipping on orders over $500 inc GST.
Talk to us about your shutdown
Send us your scope or parts list. We'll check the application, availability and lead times across our Perth and Sydney warehouses.
We supply and support the product. Your team or your integrator installs and commissions it. We make sure it is the right one.
Phone
1300 881 876